Whether your project is at the north, south, east, west or center of the nation, simple or complex, we are ready to assist with the services you need. Our highly skilled Team shares a common goal – meet our customers’ needs in a timely manner with the highest quality of service, superior workmanship and maximum safety.
Weed, CA
Weed, CA
ATTACHMENT INCLUDE:
July/August 2021
Click on video link to download and watch.
Click arrows on picture to scroll through pictures.
Kansas City, MO
Kansas City, MO
ATTACHMENT INCLUDE:
Click Arrow Keys to Scroll thru Pictures
New Bridge Construction
New Bridge Construction
Box Culvert Install
Box Culvert Install
Retainer Repair
Retainer Repair
Installing New Tie Deck
Installing New Tie Deck
Frame Bent
Frame Bent
ATTACHMENT INCLUDE:
Our ZA bridge division built and installed a steel frame Bent replacing the existing timber Bent. We also did a pier restoration on the supporting structure.
Drift Removal
Drift Removal
ATTACHMENT INCLUDE:
We are removing drift and debris in a main river channel with the assistance of our river barges, river boat, and our komatsu excavator.
Bridge Fire Rebuild
Bridge Fire Rebuild
ATTACHMENT INCLUDE:
Our ZA team came together to install a new timber deck including ties and walkway during a unfortunate bridge fire. This team installed the 350′ deck system in only 48 hours.