Our Projects

Our Projects

Whether your project is at the north, south, east, west or center of the nation, simple or complex, we are ready to assist with the services you need. Our highly skilled Team shares a common goal – meet our customers’ needs in a timely manner with the highest quality of service, superior workmanship and maximum safety.

Port Bienville, MS

Traction Motor change

Grove Hill, AL

Cleanup from derailment using Komatsu PC360LC-11, Komatsu Hi-Rail PC-238 & CAT 583 Sideboom

LaPlace, LA

LaPlace, LA

New Orleans, LA

New Orleans, LA

Russell, MS

Clean up in Russell, MS

Whatley, AL

Clean up in Whatley, AL

Weed, CA

July/August 2021 

Click on video link to download and watch.

Video Aug 16, 9 57 20 AM

 

Click arrows on picture to scroll through pictures.

Caryville, TN

Mainline culvert installation after washout.

Bellevue, OH

Senoia, Georgia

110 Link-Belt – rerailing cars.

 

Click Arrow Keys to Scroll thru Pictures

Derailment

Click Arrows to Scroll thru Pictures

Kansas City, MO

Click Arrow Keys to Scroll thru Pictures

New Construction

New Bridge Construction

Wash out repair

Wash out repair

Brandt Ties

Brandt Truck Tie Distribution

Switch Install

Installing Switch

Tamping Track

Tamping Track

Scale repair

Steel Coil Load Transfer

Steel Coil load Transfer

Box Culvert Install

Box Culvert Install

Retainer Repair

Retainer Repair

Derailment Project

Staging MS State Fire Academy Training Tanker

Bridge Project

Installing New Tie Deck

Track Wash Out

Wash Out

Track Undercutting

Undercutting Mainline Track

Track Tie Installation

Tie Installation

Track Post Derailment Repair

Post Derailment Repair

Track Hump Switch Installation

Hump Switch Installation

Derailment Load Out Tie Down

Load out Tie Down

Bridge Frame Bent

Frame Bent

Our ZA bridge division built and installed a steel frame Bent replacing the existing timber Bent. We also did a pier restoration on the supporting structure.

Bridge Drift Removal

Drift Removal

We are removing drift and debris in a main river channel with the assistance of our river barges, river boat, and our komatsu excavator.

Bridge Fire Rebuild

Bridge Fire Rebuild

Our ZA team came together to install a new timber deck including ties and walkway during a unfortunate bridge fire. This team installed the 350′ deck system in only 48 hours.

Industrial Service Project

Replacing Panels

Services

Scheduled Preventative Maintenance